Mashkel Dam Washuk Tender Corrigendum: Eligibility and Pre-Bid Meeting Clarifications
Mashkel Dam Washuk Tender Corrigendum · Washuk · The Express Tribune,
Tender advertisement published in The Express Tribune on Saturday, 21 November 2026, listed under Washuk. Issued by Mashkel Dam Washuk Tender Corrigendum.
Similar tenders
All tendersMore tenders
Advertisement details
The Project Director, Mashkel Dam, has issued a corrigendum to the tender notice for Mashkel Dam at Washuk (SP), reference TSE-2627101217683 and DAB/AB No. 497/31-10-2026.
The following clarifications apply to the tender:
| Subject | Clarification |
|---|---|
| PEC specialization code | The PEC Specialization Code CE01 in the eligibility criteria shall be read as CE01 (i). |
| Certificate for ongoing projects | For ongoing projects, the requirement for a Completion Certificate shall be read as a Performance Certificate. |
| Pre-bid meeting | The meeting will be held on 25 November 2026 at the Project Director's Office, Chaman Housing Scheme, Quetta. |
| Engineering drawings and technical provisions | All essential data is available on the B-PPRA Portal. Due to portal file-size limitations, complete sets of Detailed Engineering Drawings and Technical Provisions are available at the office of the Project Director, Mashkel Dam. Prospective bidders may obtain them during office hours upon formal request. |
| Assistance with portal files | Bidders experiencing difficulty viewing or downloading any files or data may approach the Project Director's Office for assistance. |
| Amended bidding documents | For further details, bidders may consult the amended Bidding Documents available on the B-PPRA EPPS Portal. |
Issuing authority: Project Director, Mashkel Dam. Publication reference: AB No. 572/20-11-2026.
Directorate of Public Relations website: www.dpr.gob.pk. Social media: Twitter @dpr_gob; Instagram dpr.gob; Facebook @dpr.balochistan.
Published in The Express Tribune on Saturday, 21 November 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.