NEPRA Invites Comments on Reon One's 4.5 MW Hybrid (Solar + Wind + BESS) Project at Port Qasim, Karachi
NEPRA Invites Comments on Reon One's 4.5 MW Hybrid (Solar + Wind + BESS) Project at Port Qasim, Karachi · Karachi · The News International,
Notice advertisement published in The News International on Wednesday, 17 June 2026, listed under Karachi. Issued by NEPRA Invites Comments on Reon One's 4.5 MW Hybrid (Solar + Wind + BESS) Project at Port Qasim, Karachi.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
National Electric Power Regulatory Authority (NEPRA) has registered an application from Reon One (Private) Limited seeking grant of concurrence for a hybrid power generation facility to be installed at Tripack Films Limited, Northwestern Industrial Zone, Port Qasim, Bin Qasim Town, Karachi. NEPRA is inviting comments from stakeholders and interested/affected parties.
| Issuer | National Electric Power Regulatory Authority (NEPRA) |
|---|---|
| Applicant | Reon One (Private) Limited |
| Project Type | Hybrid Power Generation Facility (Solar + Wind + REFLEX Battery Energy Storage System - BESS) |
| Location | Tripack Films Limited, Northwestern Industrial Zone, Port Qasim, Bin Qasim Town, Karachi |
| Installed Capacity |
|
| Performance Parameters | Solar efficiency: 16.73%; Wind: 29% (as stated) |
| Purpose | Generate electricity at Tripack Films Limited premises for sale to the host facility |
| Comments / Objections | Stakeholders and interested/affected parties may submit comments to the NEPRA Registrar within 15 days from the date of publication. |
| Application Documents | Application submitted by Reon One is available on NEPRA website: https://www.nepra.org.pk/news.php |
| Contact for Submissions | Registrar, NEPRA Tower, G-5/1 (East), Islamabad; Tel: 9206500; Fax: 2600026; Email: [email protected] |
Note: Allotment of a registration number to the application shall not be construed as approval of the application. For further details or to view the application, refer to NEPRA's official notice on its website or contact the NEPRA Registrar.
Published in The News International on Wednesday, 17 June 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.
Questions about this notice
- What is the last date for this notice?
- This advertisement prints no last date. Read the clipping and confirm with NEPRA Invites Comments on Reon One's 4.5 MW Hybrid (Solar + Wind + BESS) Project at Port Qasim, Karachi.
- Which newspaper published this notice?
- The News International, in the edition of Wednesday, 17 June 2026.
- Which city is this notice listed under?
- Karachi. That is the city recorded for this advertisement — taken from the notice where it names a place, and otherwise from the newspaper edition it appeared in.
- How do I respond to this notice?
- Follow the instructions printed in the clipping; the advertiser’s own page is linked from this one. Applications are not submitted through this page.